So, How About That Bathroom cont#3
Alright, now the entire room is ready to be transformed. If you’re keeping the original tub then you have less work to do. Maybe you’re thinking of tiles or a tub surround (unless you have one of those one or two piece fiberglass tub/shower units) to change the looks of the tub/shower area. We can work with anything here.
Now is where the creativity begins. Take a look at your plans for the room and decide where you want to start. With just a light remodel you will have a toilet and vanity/sink combo to change and with complete gut and replace everything you will have a good amount of work on your hands.
With this article I’m going all the way for the gut and replace. I will also have details for the light remodel but I want to cover the complete picture so as not to leave anyone out.
I’ve told you how to remove all of the items in the room except the cabinets on the wall. Maybe a built in medicine cabinet or a wall mount one with a mirror on it. These generally are removable with screws. Be cautious that you don’t pull out the last screw with nothing holding up the cabinet. When they fall they don’t do well. There are also towel racks to remove. Most of these have a little screw under the bottom edge of the wall ring that holds them to a bracket. No need to pull the screw all the way out. Just a little ways to get the plate off the bracket.
Ok, here we go. To gut the whole place you will have to remove all of the drywall/plaster and discard it. No sense in reusing drywall if you are gutting a room. once you have all of the drywall pried off the wall you pull out all of the screws and or nails and get clean studs. The outside wall needs to have insulation when you put the new drywall on. So if there is none there now plan on getting some.
This is the perfect time to add new outlets, move plumbing or move a wall. You can make a raised deck if you have the room and you can install a sky lite. Maybe a new quieter and more powerful exhaust fan and/or recessed lighting. It’s your call.
If you are thinking of moving plumbing and not sure if you can do the work then hire a plumber to come move it for you. That way it will be done correctly. You aren’t looking for a complete re plumb of the house so you shouldn’t have to pay a huge price. A true plumber will be fair and get the work done fast and to code.
You can do the same with electrical or just get one of those electrical books from the library and do it yourself. This is not a good platform for me to go into how to wire and how to plumb. There are many books available for that.
Now when everything is where you want it it’s time to start putting the drywall on. This is not a hard task to perform. It is awkward and a little heavy and you may want to have someone else do it for you. This is fine and I would hire a drywall company to hang and tape it to paint ready. This will be the easiest way by far but if you are ready to tackle it yourself then I’ll walk you through it.
First thing is the ceiling, otherwise known as the “lid” in drywall terms. Get a friend or two and keep the beer away from them till the drywall is up. This way you will get a better product with less damage of the drywall. In the ceiling there are going to be cutouts for the lighting and ventilation. The easiest way to make these holes is with a drywall saw. You will need to locate the spot on the drywall for the hole before you hang it on the ceiling. This takes two measurements, one from the side and one from the end. The drywall is designed to run across the ceiling joists not with them for it’s best strength. Now get your measurement from the end and make a pencil mark on the drywall. Then take the other one from the side. If it is the light box then the measurements are of the center and if the exhaust fan then you will get each side. A drywall T-square is handy here.
Once the drywall is marked out with the holes try to visualize if you grabbed the sheet and rolled it upside down over your head if the holes will be on the correct spots. If it seems backwards then the measurements could be from the wrong side on the sheet. When you are satisfied they are in the right places it is time to saw the holes out. The round hole for the light box needs to be cut out round and close to the size of the box so you don’t have to fix it with taping. So just big enough to slip over the box edge and same with the fan box. Now get the sheet lifted up and screw or nail it into place. You will need screws at each point available around the perimeter and then along each ceiling joist in the middle you will need at least 3 screws evenly spaced across the sheet. This will make a permanent application.
Now it is time for the next sheet. Follow the same steps as before and take all of the side measurements from the side of the drywall you just hung till you have covered the whole ceiling.
Now comes the walls. There are three way to hang the walls. You can stand the sheets up from the floor to the ceiling or you hang from side to side which is the professional way. There are two ways to hang from side to side. One way is to hang the top sheet first and then the bottom and the other way is hand the bottom first and stack the top on it. When you pick out the way you like you will be ready to get started.
Let’s say you will be stacking with the bottom first. Measure the length of the wall. If the wall is longer than the drywall then measure to the nearest length but not longer and you will cut the sheet to the middle of the stud. If there are holes to be made in the sheet then the same methods as before should be used. This time you will measure from the floor up and from one of the sides. Tackle the water wall first to get it out of the way. Once that is done you should be able to tackle the rest of the room from what you have learned so far.
See you on the next post. Where I will go over the taping of the drywall you just hung.
For a comprehensive guide to bathroom remodeling 
